How To Work On A Spreed Sheet Document Using The Information Given
You also build a pie chart sheet to graph the proportion that each category contributes to total revenue.
[Student Learning Outcomes 3.1, 3.2, 3.3, 3.4, 3.5, 3.6]
File Needed: ClassicGardens-03.xlsx (Available from the Start File link.)
Completed Project File Name: [your name]-ClassicGardens-03.xlsx
Skills Covered in This Project
Create a chart object.
Size and position a chart object.
Edit and format chart elements.
Edit the source data for a chart.
Build a pie chart sheet.
Use texture as fill.
Add and format data labels in a chart.
Alternate Instruction for Microsoft 365 Apps icon This image appears when a project instruction has changed to accommodate an update to Microsoft 365 Apps. If the instruction does not match your version of Office, try using the alternate instruction instead.
Open the ClassicGardens-03.xlsx start file. If the workbook opens in Protected View, click the Enable Editing button so you can modify it. The file will be renamed automatically to include your name. Change the project file name if directed to do so by your instructor, and save it.
Create a Clustered Column chart object for cells A4:G9.
Move the chart object so that its top-left corner is at cell A12. Size the bottom of the chart to reach cell H30.
Edit the chart title to display CGL Major Sales Revenue and press Enter to start a new line. On the second line, type Second and Third Quarters.
Apply chart Style 14 to the chart.
Format the first line and the second line of the chart title to a font size of 20 pt.
Apply a 1 pt Black, Text 1 (second column) outline to the chart area.
Verify that the chart is still selected. In the highlighted range in the worksheet, drag the resize pointer to remove